Delivered marking projects across the Gulf
Real projects, real results. Browse our portfolio of highway, parking, warehouse, plant and airport marking work in the UAE and Saudi Arabia.

Madinah Pilgrim Corridor Thermoplastic Marking
Re-mark 7.2 km of pilgrim corridor roads in central Madinah with high-UV-resistance, pedestrian crossings and shuttle-bus lane segregation ahead of Ramadan and Hajj seasons. The corridor had to remain open to pilgrim traffic throughout, with marking scheduled in night-shift windows only.

Madinah Healthcare Facility Hygienic Epoxy Floor
Install a hygienic, seamless epoxy floor across 4,800 m² of a Madinah healthcare facility including operating theatres, sterilisation departments, ICUs and isolation rooms. The system had to meet Saudi MoH infection-control standards, withstand daily chemical disinfection, and be installed without disrupting the adjacent emergency department.

Makkah Central Area Hotel Epoxy Floor
Install a premium, high-gloss, seamless epoxy floor across 5,200 m² of hotel lobby, prayer areas and corridor circulation space in a Makkah central-area hotel. The system had to achieve a uniform mirror finish, low VOC emissions for immediate occupancy, and accommodate daily high-footfall prayer-time traffic.

Makkah Pilgrim Season Parking Structure Marking
Re-mark a 6,200-bay, 6-level pilgrim parking structure serving Makkah accommodation towers ahead of Hajj season, with wayfinding colour coding for non-Arabic-speaking pilgrims, accessibility bays for elderly and disabled pilgrims, and emergency-vehicle access lanes. All work had to be completed before pilgrim arrival.

Yanbu Commercial Port Cargo Warehouse Marking
Mark a 13,800 m² cross-dock warehouse at Yanbu Commercial Port operating 24/7 with forklift traffic, racking aisles, customs-bonded zones and a 1,800 m² chilled annex. The facility required full HSE compliance per Saudi Ports Authority (Mawani) standards, without interrupting cargo receipt.

Yanbu Royal Commission Power Plant Industrial Marking
Mark hazardous zones, pipe identification, turbine-house floor markings and emergency escape routes across a live Yanbu Royal Commission (RCY) power-and-water plant, with hydrocarbon exposure, high ambient temperatures and ATEX Zone 1 classified areas. The plant had to remain operational throughout, with marking scheduled around PTW windows.

Jubail Industrial City Internal Road Marking
Re-mark 16 km of internal roads within Jubail Industrial City serving petrochemical plants, with heavy HGV traffic, dust accumulation and high ambient temperatures. The existing lines had been abraded by HGV traffic and degraded by UV exposure within 4 years, requiring a longer-life solution.

Jubail Royal Commission Petrochemical Plant Marking
Mark hazardous zones, pipe identification, bunded-area escape routes and emergency shower signage across a live petrochemical plant in the Royal Commission of Jubail (RCJY), with hydrocarbon exposure, ATEX Zone 1 classified areas and stringent RCJY HSE standards. The plant had to remain operational throughout, with marking scheduled around PTW windows.

Al Khobar Business District Commercial Epoxy Floor
Install a premium, high-gloss, seamless epoxy floor across 3,800 m² of grade-A corporate office space in Al Khobar's business district during a fit-out programme. The floor had to achieve a uniform mirror finish, low VOC emissions for immediate occupancy, and accommodate raised-access flooring throughout.

Al Khobar Corniche Tourist-Grade Safety Signage
Design and install a tourist-grade safety and wayfinding signage package along Al Khobar's 5 km corniche including pedestrian safety, beach-access warnings, lifebuoy stations, and bilingual Arabic-English wayfinding. The corniche had to remain open to visitors throughout installation.

Dammam Refinery Safety Signage & Pipe Identification Package
Design, manufacture and install a complete safety signage and pipe-identification package for a Dammam refinery, including ISO 7010 pictograms, photoluminescent escape routes, ASME A13.1 pipe banding on 24 km of pipework, and ATEX-compliant signage in Zone 1 classified areas. The refinery had to remain operational throughout.

Dammam Eastern Province Energy Facility Marking
Mark hazardous zones, pipe identification, bunded-area escape routes and emergency shower signage across a live Eastern Province power-and-water facility with 8 generating units, hydrocarbon exposure, and ATEX Zone 1 classified areas. The facility had to remain operational throughout, with marking scheduled around PTW windows.

Dammam King Abdul Aziz Port Container Terminal Marking
Mark lane segregation, hazard zones, RTG crane runways and pedestrian routes across a 15,800 m² container terminal at King Abdul Aziz Port, Dammam. The terminal operated 24/7 with straddle carriers and reach stackers, requiring marking that could withstand heavy container-handling equipment traffic without halting operations.

Jeddah Islamic Port Logistics Warehouse Marking
Mark a 19,500 m² cross-dock warehouse at Jeddah Islamic Port operating 24/7 with forklift traffic, racking aisles, customs-bonded zones and chilled annex. The facility required full HSE compliance per Saudi Ports Authority (Mawani) standards, without interrupting cargo receipt.

Jeddah Red Sea Mall Parking Lot Marking
Re-mark a 3,400-bay surface and deck parking lot at Jeddah's Red Sea Mall with high-UV-resistance and coastal-humidity tolerance, plus EV charging stations, family zones and accessibility bays. The work had to be done without closing the mall during peak weekend trading.

Jeddah Corniche Coastal Road Thermoplastic Marking
Re-mark 12 km of the Jeddah Corniche coastal road with humidity-resistant thermoplastic, edge lines, pedestrian crossings and bike-lane segregation. The existing cold-paint lines had degraded within 16 months due to Red Sea coastal humidity and salt spray, requiring a longer-life system.

Riyadh King Khalid International Airport Apron Marking
Re-mark 22 contact and remote stands at Riyadh King Khalid International Airport (RUH) to ICAO Annex 14 standards within night-shift NOTAM windows of 4 hours each, with jet-blast resistance and high wet-reflectivity. The apron had to remain fully operational for daytime widebody operations including A380 and B777.

Riyadh MODON Industrial City Warehouse Marking
Mark a 28,400 m² MODON Riyadh industrial warehouse operating 24/7 with forklift traffic, racking aisles, machine-guarding zones and dispatch docks. The facility required full HSE compliance per Saudi Aramco GES-001 and ISO 7010 colour coding, without interrupting production.

Riyadh Mega-Mall Parking Deck Marking
Re-mark a 4,600-bay, 5-level parking deck at a Riyadh mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays, no EV or family zones, and accessibility signage was non-compliant with Saudi Building Code (SBC 801) accessibility requirements.

Riyadh King Fahd Road Thermoplastic Re-Marking
Re-mark 18 km of Riyadh's flagship King Fahd Road corridor across 6 lanes plus median, upgrading reflectivity to MOMRAH night-driving spec while keeping the road open during daytime peak traffic. The existing lines had degraded after 6 years of Vision 2030-era traffic growth.

Umm Al Quwain Coastal Road Thermoplastic Marking
Re-mark 6.8 km of the UAQ coastal road with humidity-resistant thermoplastic, edge lines and pedestrian crossings. The existing cold-paint lines had degraded within 14 months due to coastal salt spray and humidity, and the client needed a longer-life system.

Umm Al Quwain Marina Safety Signage Package
Design and install a comprehensive marine safety signage package for a 980-berth UAQ marina development, including channel markers, no-wake zones, lifebuoy stations, fire assembly points, and bilingual Arabic-English wayfinding. The marina had to remain operational throughout installation.

Al Ain Heritage Route Safety & Wayfinding Signage
Design and install a safety and wayfinding signage package along Al Ain's UNESCO-listed heritage route covering 6 sites, with traffic calming, pedestrian safety, heritage-sensitive mounting and bilingual Arabic-English messaging. Mounting could not damage historic fabric.

Al Ain Mall Multi-Level Parking Deck Marking
Re-mark a 2,400-bay, 4-level parking deck at an Al Ain shopping mall, adding family and EV zones, while keeping the deck open to visitors. The existing layout had faded bays and accessibility signage was non-compliant with the UAE Universal Design Code.

Fujairah Corniche Coastal Road Marking
Re-mark 5.4 km of the Fujairah Corniche coastal road with high-humidity-tolerant materials, edge lines, pedestrian crossings and parking-bay demarcation along the beachfront. Coastal humidity and salt spray had degraded previous cold-paint markings within 14 months.

Fujairah Port Tank Farm Industrial Hazard Marking
Mark hazardous zones, pipe identification, bunded-area escape routes and emergency shower signage across a live Fujairah Port crude and product tank farm with 36 storage tanks, hydrocarbon exposure, and ATEX Zone 1 classified areas. The facility had to remain operational throughout, with marking scheduled around PTW windows.

Ras Al Khaimah Specialty Hospital Epoxy Floor
Install a hygienic, seamless epoxy floor across 4,200 m² of a RAK specialty hospital including operating theatres, sterilisation departments, ICUs and isolation rooms. The system had to meet MoHAP infection-control standards, withstand daily chemical disinfection, and be installed without disrupting the adjacent emergency department.

Ras Al Khaimah Quarry Access Road Thermoplastic Marking
Re-mark 8.6 km of single-carriageway access road serving three RAK limestone quarries, with heavy HGV traffic, dust accumulation and steep gradients. The existing lines had been abraded by quarry-truck traffic within 18 months and the client needed a longer-life solution.

Ajman Industrial Area Warehouse Marking
Mark a 9,200 m² Ajman Industrial Area warehouse with forklift lanes, racking aisles, pedestrian walkways and machine-guarding zones. The facility had a single shift pattern and required all marking completed within two weekend shutdowns to avoid production loss.

Ajman Corniche Waterfront Parking Lot Marking
Re-mark a 1,800-bay waterfront parking lot along Ajman Corniche with high-UV-resistance and coastal-humidity tolerance, plus accessibility bays, EV charging stations and a new taxi-rank layout. The work had to be done without closing the corniche to beachgoers during weekend peak.

Sharjah Teaching Hospital Safety Signage Package
Design, manufacture and install a complete safety signage package for a 320-bed Sharjah teaching hospital, including ISO 7010 pictograms, photoluminescent escape routes, departmental wayfinding, oxygen and medical-gas identification, and controlled-access warnings. The hospital remained fully operational throughout installation.

Sharjah Industrial Area Manufacturing Epoxy Floor
Install a chemical-resistant epoxy floor across a 5,400 m² Sharjah manufacturing facility producing polymer compounds, with daily chemical exposure, forklift traffic and hot-process zones. The client required 5-day production downtime maximum across the full floor installation.

Sharjah University City Road Marking
Re-mark 9.4 km of internal roads and pedestrian crossings across Sharjah's University City campus, with traffic-calming humps, raised pedestrian crossings and dedicated shuttle-bus lanes. The work had to be sequenced around the academic calendar with zero disruption during exam weeks.

Sharjah Hamriyah Free Zone Industrial Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical facility in Hamriyah Free Zone Zone 1, with hydrocarbon exposure and ATEX Zone 1 requirements. The facility had to remain operational throughout, with marking applied in classified areas only during permit-controlled shutdowns.

Dubai DIFC Gate District Epoxy Office Floor
Install a premium, high-gloss, seamless epoxy floor across 3,200 m² of grade-A office space in the DIFC Gate District during a fit-out programme. The floor had to achieve a uniform mirror finish, low VOC emissions for immediate occupancy, and accommodate raised-access flooring throughout.

Dubai World Central Al Maktoum Airport Cargo Apron Marking
Mark a new 4.8 km cargo apron and taxiway at Al Maktoum International Airport (DWC) to ICAO Annex 14 standards, with night-cure windows of just 4 hours and the requirement that cargo operations resume each morning without delay. Reflectivity had to meet Q3 wet spec for low-visibility operations.

Dubai JAFZA Logistics Warehouse Floor Marking
Mark a 26,000 m² JAFZA logistics warehouse operating 24/7 with cross-dock doors, VNA racking aisles and a 4,200 m² chilled annex. The client needed HSE-compliant colour coding, pedestrian segregation and pallet-location grid markings, all without interrupting goods receipt.

Dubai Sheikh Zayed Road Thermoplastic Re-Marking
Re-mark 14 km of Dubai's flagship Sheikh Zayed Road corridor across 6 lanes plus hard shoulder, upgrading reflectivity to RTA night-driving spec while keeping the highway open during daytime peak traffic. The existing lines had degraded after 5 years of heavy HGV and commuter traffic.

Dubai Expo City Visitor Parking Lot Marking
Mark a 3,800-bay surface parking lot at the legacy Expo 2020 site (now Expo City Dubai) ahead of its reopening as a permanent visitor destination. The lot required EV, accessibility and family zones plus wayfinding colour coding, with all work completed before opening weekend.

Abu Dhabi International Airport Apron Stand Marking
Re-mark 18 contact and remote stands at Abu Dhabi International Airport to ICAO Annex 14 standards within night-shift NOTAM windows of 4 hours each, with jet-blast resistance and high wet-reflectivity. The apron had to remain fully operational for daytime widebody operations.

Abu Dhabi Medical City Hygienic Epoxy Floor
Install a hygienic, seamless, chemical-resistant floor across a 6,800 m² clinical and sterilisation facility in Abu Dhabi Medical City. The system had to withstand daily chemical disinfection, heavy equipment traffic and meet DoH infection-control standards, all while the adjacent clinical wing remained operational.

Abu Dhabi Mussafah Industrial Warehouse Floor Marking
Mark an 18,500 m² 24/7 distribution centre in Mussafah Industrial Area with forklift traffic lanes, pedestrian walkways, racking bays and hazard zones without halting goods receipt. The slab had previously been sealed and required surface profiling before any line system would bond.

Abu Dhabi Yas Island Mega-Mall Parking Deck Marking
Re-mark a 5,200-bay multi-level parking deck serving a Yas Island mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays and no dedicated EV or family parking zones, and the client wanted to add accessibility and EV capacity to meet 2024 sustainability targets.

Abu Dhabi Corniche Bicycle Lane Thermoplastic Marking
Install a continuous 6.2 km dedicated bicycle lane along the Abu Dhabi Corniche promenade with high skid resistance and UV-stable red colouring that would not fade under direct coastal sun. The work had to be done without closing the popular corniche to pedestrians or cyclists outside early-morning windows.

Sharjah Manufacturing Facility Epoxy Floor
Install a hygienic, chemical-resistant floor across a 4,500 m² manufacturing facility with minimal production downtime and strict hygiene requirements.

Dammam Airport Taxiway Marking Upgrade
Upgrade taxiway and apron markings to ICAO Annex 14 within night-shift NOTAM windows, with jet-blast resistance and high wet-reflectivity.

Jubail Petrochemical Plant Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical plant with hydrocarbon exposure and ATEX requirements.

Riyadh Logistics Hub Warehouse Floor Marking
Mark 22,000 m² of a 24/7 logistics warehouse with forklift lanes, pedestrian walkways, and storage bays, while keeping the facility operational throughout.

Dubai Mega-Mall Parking Deck Marking
Re-mark a 3,200-bay multi-level parking deck without closing the mall, while re-optimising the layout to increase capacity and add EV and family bays.

Abu Dhabi–Al Ain Highway Thermoplastic Marking
Re-mark 42 km of a high-speed inter-city highway with minimal lane closures during peak pilgrimage and commuter traffic, while upgrading reflectivity to night-driving standards.