Dubai World Central Al Maktoum Airport Cargo Apron Marking
Mark a new 4.8 km cargo apron and taxiway at Al Maktoum International Airport (DWC) to ICAO Annex 14 standards, with night-cure windows of just 4 hours and the requirement that cargo operations resume each morning without delay. Reflectivity had to meet Q3 wet spec for low-visibility operations.
The Challenge
Mark a new 4.8 km cargo apron and taxiway at Al Maktoum International Airport (DWC) to ICAO Annex 14 standards, with night-cure windows of just 4 hours and the requirement that cargo operations resume each morning without delay. Reflectivity had to meet Q3 wet spec for low-visibility operations.
Our Solution
Specified Type III MMA cold plastic with Type II glass beads and preformed MMA hold-position markings. MMA was selected for its 30-minute cure at 25Β°C ambient, allowing the full apron to be marked in sequential NOTAM windows without affecting daytime freighter schedules.
Execution
Airside crews surveyed geometry to Annex 14, water-blasted and dried the asphalt, then extruded MMA taxiway centrelines, apron stand numbers, hold positions and edge markings. A total of 4.8 km of taxiway centreline plus 14 cargo stands were marked across 22 night-shift NOTAMs.
Project Gallery
βThe MMA cure time was the difference between success and failure on this project. Gulf Seismic delivered on every NOTAM window.β
Related projects
Dubai Mega-Mall Parking Deck Marking
Re-mark a 3,200-bay multi-level parking deck without closing the mall, while re-optimising the layout to increase capacity and add EV and family bays.
Dammam Airport Taxiway Marking Upgrade
Upgrade taxiway and apron markings to ICAO Annex 14 within night-shift NOTAM windows, with jet-blast resistance and high wet-reflectivity.
Abu Dhabi International Airport Apron Stand Marking
Re-mark 18 contact and remote stands at Abu Dhabi International Airport to ICAO Annex 14 standards within night-shift NOTAM windows of 4 hours each, with jet-blast resistance and high wet-reflectivity. The apron had to remain fully operational for daytime widebody operations.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities