Ajman Corniche Waterfront Parking Lot Marking
Re-mark a 1,800-bay waterfront parking lot along Ajman Corniche with high-UV-resistance and coastal-humidity tolerance, plus accessibility bays, EV charging stations and a new taxi-rank layout. The work had to be done without closing the corniche to beachgoers during weekend peak.
The Challenge
Re-mark a 1,800-bay waterfront parking lot along Ajman Corniche with high-UV-resistance and coastal-humidity tolerance, plus accessibility bays, EV charging stations and a new taxi-rank layout. The work had to be done without closing the corniche to beachgoers during weekend peak.
Our Solution
Specified a UV-stable solvent-based acrylic line system with preformed thermoplastic symbols for high-traffic durability. Layout was re-engineered to add 36 EV charging bays, 56 accessibility bays and a 12-bay taxi rank, with green tourism-zone wayfinding striping.
Execution
Crews worked Sunday-to-Thursday overnight shifts, applying 1,800 bay lines with 36 EV bay boxes (green corner detail), 56 accessibility symbols, taxi-rank yellow hatching and pedestrian walkways with anti-skid hatch. Final layout was surveyed against Ajman Municipality parking standards.
Project Gallery
Related projects
Dubai Mega-Mall Parking Deck Marking
Re-mark a 3,200-bay multi-level parking deck without closing the mall, while re-optimising the layout to increase capacity and add EV and family bays.
Abu Dhabi Yas Island Mega-Mall Parking Deck Marking
Re-mark a 5,200-bay multi-level parking deck serving a Yas Island mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays and no dedicated EV or family parking zones, and the client wanted to add accessibility and EV capacity to meet 2024 sustainability targets.
Dubai Expo City Visitor Parking Lot Marking
Mark a 3,800-bay surface parking lot at the legacy Expo 2020 site (now Expo City Dubai) ahead of its reopening as a permanent visitor destination. The lot required EV, accessibility and family zones plus wayfinding colour coding, with all work completed before opening weekend.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities
