Dubai Expo City Visitor Parking Lot Marking
Mark a 3,800-bay surface parking lot at the legacy Expo 2020 site (now Expo City Dubai) ahead of its reopening as a permanent visitor destination. The lot required EV, accessibility and family zones plus wayfinding colour coding, with all work completed before opening weekend.
The Challenge
Mark a 3,800-bay surface parking lot at the legacy Expo 2020 site (now Expo City Dubai) ahead of its reopening as a permanent visitor destination. The lot required EV, accessibility and family zones plus wayfinding colour coding, with all work completed before opening weekend.
Our Solution
Engineered a phased marking programme splitting the 3,800-bay lot into 6 sectors. Used solvent-based acrylic line paint with preformed thermoplastic symbols at bay entries for high-traffic durability. Layout included 96 EV bays, 124 accessibility bays and a green family zone near the visitor entrance.
Execution
Surface was swept, blown and primed where required. Two crews worked in parallel sectors applying 3,800 bay lines, 96 EV bay boxes with green corner detailing, accessibility symbols, and pedestrian walkways with anti-skid hatch. Final as-built was verified by total-station survey against RTA parking standards.
Project Gallery
Related projects
Dubai Mega-Mall Parking Deck Marking
Re-mark a 3,200-bay multi-level parking deck without closing the mall, while re-optimising the layout to increase capacity and add EV and family bays.
Abu Dhabi Yas Island Mega-Mall Parking Deck Marking
Re-mark a 5,200-bay multi-level parking deck serving a Yas Island mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays and no dedicated EV or family parking zones, and the client wanted to add accessibility and EV capacity to meet 2024 sustainability targets.
Dubai Sheikh Zayed Road Thermoplastic Re-Marking
Re-mark 14 km of Dubai's flagship Sheikh Zayed Road corridor across 6 lanes plus hard shoulder, upgrading reflectivity to RTA night-driving spec while keeping the highway open during daytime peak traffic. The existing lines had degraded after 5 years of heavy HGV and commuter traffic.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities