Sharjah University City Road Marking
Re-mark 9.4 km of internal roads and pedestrian crossings across Sharjah's University City campus, with traffic-calming humps, raised pedestrian crossings and dedicated shuttle-bus lanes. The work had to be sequenced around the academic calendar with zero disruption during exam weeks.
The Challenge
Re-mark 9.4 km of internal roads and pedestrian crossings across Sharjah's University City campus, with traffic-calming humps, raised pedestrian crossings and dedicated shuttle-bus lanes. The work had to be sequenced around the academic calendar with zero disruption during exam weeks.
Our Solution
Specified hot-applied thermoplastic for all lane lines, edge lines and pedestrian crossings, with preformed thermoplastic symbols for shuttle lanes and stop bars. Anti-skid calcined bauxite was applied on all raised crossings and humps for wet-weather skid resistance.
Execution
Crews water-blasted ghost lines, applied thermoplastic at 3.0 mm with simultaneous glass-bead dispensing, and added 14 raised pedestrian crossings with anti-skid surface. Work was scheduled in term-break windows plus overnight shifts during exam weeks, achieving zero daytime disruption.
Project Gallery
Related projects
Sharjah Manufacturing Facility Epoxy Floor
Install a hygienic, chemical-resistant floor across a 4,500 mΒ² manufacturing facility with minimal production downtime and strict hygiene requirements.
Abu Dhabi Corniche Bicycle Lane Thermoplastic Marking
Install a continuous 6.2 km dedicated bicycle lane along the Abu Dhabi Corniche promenade with high skid resistance and UV-stable red colouring that would not fade under direct coastal sun. The work had to be done without closing the popular corniche to pedestrians or cyclists outside early-morning windows.
Sharjah Hamriyah Free Zone Industrial Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical facility in Hamriyah Free Zone Zone 1, with hydrocarbon exposure and ATEX Zone 1 requirements. The facility had to remain operational throughout, with marking applied in classified areas only during permit-controlled shutdowns.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities