Riyadh Mega-Mall Parking Deck Marking
Re-mark a 4,600-bay, 5-level parking deck at a Riyadh mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays, no EV or family zones, and accessibility signage was non-compliant with Saudi Building Code (SBC 801) accessibility requirements.
The Challenge
Re-mark a 4,600-bay, 5-level parking deck at a Riyadh mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays, no EV or family zones, and accessibility signage was non-compliant with Saudi Building Code (SBC 801) accessibility requirements.
Our Solution
Engineered a floor-by-floor phasing plan with two floors marked simultaneously while mall management routed visitors to alternate decks. Layout was re-optimised using CAD bay-packing analysis to add EV, family and accessibility bays, plus colour-coded zone striping for visitor wayfinding.
Execution
Black-out of ghost lines using fast-drying water-based acrylic, then solvent-based acrylic line paint applied via airless striper at 1.8 mm dry film. Preformed thermoplastic disabled, EV and arrow symbols were heat-applied for durability, with green family zones, blue accessibility, amber EV and red VIP zones throughout the 5-level deck.
Project Gallery
Related projects
Dubai Mega-Mall Parking Deck Marking
Re-mark a 3,200-bay multi-level parking deck without closing the mall, while re-optimising the layout to increase capacity and add EV and family bays.
Riyadh Logistics Hub Warehouse Floor Marking
Mark 22,000 mΒ² of a 24/7 logistics warehouse with forklift lanes, pedestrian walkways, and storage bays, while keeping the facility operational throughout.
Abu Dhabi Yas Island Mega-Mall Parking Deck Marking
Re-mark a 5,200-bay multi-level parking deck serving a Yas Island mega-mall without disrupting operations during peak weekend trading. The existing layout had faded bays and no dedicated EV or family parking zones, and the client wanted to add accessibility and EV capacity to meet 2024 sustainability targets.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities